Data Infrastructure Connectivity installation by Prime Infrastructure
[SERVICE: DATA_CONNECTIVITY] // SPEC: TIA/EIA-568-C

Data Infrastructure
Connectivity

Structured cabling installation, termination and FLUKE certification engineered to TIA/EIA-568-C and ISO/IEC 11801 — the reliable nervous system linking modern environments.

Related: Cable Management & Containment
[TECHNICAL SPECIFICATION]

Core Specifications

TIA-568-C
Primary Standard
CAT6A
Copper
OS2 / OM4
Fibre
Fusion / IDC
Termination
FLUKE Cert
Testing
25 Year
Warranty
[CAPABILITIES]

Service Capabilities

01

Structured Cabling Installation

High-performance CAT6A copper and fibre cabling installation, routed and dressed to specification with full traceability.

02

Copper & Fibre Termination

Precision termination of copper outlets and fibre fusion splicing, with connector and patch-panel dressing for maintainable performance.

03

FLUKE Testing & Certification

Every link and channel tested on FLUKE certification equipment, with full test reports archived against each outlet.

04

Fibre Backbone & Fusion Splicing

Fibre backbone installation and fusion splicing for high-bandwidth building and campus backbones.

05

Network Infrastructure

End-to-end network infrastructure design and deployment, from outlet to core switching and patch field.

06

25-Year Manufacturer Warranty

A 25-year manufacturer warranty is available where the installation is carried out to the cable system manufacturer's standards, passes their audit and is registered by the approved installer. Conditions and exclusions are confirmed in writing before the package starts.

[ENGAGEMENT: CABLING_SUBCONTRACTOR]

Structured cabling subcontractor for M&E contractors

London · South East · United Kingdom

Prime Infrastructure Solutions delivers structured cabling and data cabling installation as a subcontract package for M&E contractors, principal contractors and digital infrastructure providers. Scopes cover CAT6A copper, OS2 and OM4 fibre, termination, fusion splicing, patch-panel dressing and FLUKE testing through to handover information.

Cabinets, outlets and containment are installed and dressed to the project specification, with every link and channel tested and reported against TIA/EIA-568-C and ISO/IEC 11801. Fibre installation and termination, backbone splicing and testing are carried out by our own installation engineers.

Work runs from single-floor office fit-outs to data centre deployments and multi-building campuses across London and the UK.

[PROJECT EXAMPLES]

Selected Work

Colt LON4 Data Centre infrastructure project
[CASE: 001] // SECTOR: CRITICAL

Colt LON4 Data Centre

Copper and fibre cable installation within a live Colt data centre in London, delivered by our cable team alongside containment works. Routes and terminations were planned around operating critical infrastructure, with every link tested and reported on completion.

London, UK
Location
Live Data Centre
Environment
Copper & Fibre
Scope
FLUKE
Testing
QTS Data Centre — Groningen infrastructure project
[CASE: 002] // SECTOR: HYPERSCALE

QTS Data Centre — Groningen

Copper and fibre cable installation on the QTS campus in Groningen, Netherlands, delivered by our cable team as part of a hyperscale data centre programme. Work covered termination, dressing and testing across the installed cabling.

Groningen, NL
Location
Hyperscale DC
Environment
Copper & Fibre
Scope
FLUKE
Testing
[COMPLIANCE STANDARDS]
TIA/EIA-568-CISO/IEC 11801BS EN 50173

Specify with Precision

Discuss your project requirements with our engineering team.